The report from Illinois: In three days we lay ed out 198,000sq feet of concrete. With two crews of ten. Need less to say it was the most work that any of us did. After it was all done said with, I felt different about myself. I had no energy this past weekend, and I mean none. Now all we have to do is 33,000 feet of wall.(about 7miles, 32ins at a time)This is what the site looks like.
Made it two levis on friday for some work.
Sundays work.